When Repointing Has Failed, and What Goes Back

Cement pointing on a soft London brick sends the damage into the brick instead of the joint. How to read a failed joint, and the mix that goes back.

By Vladimir Castravet·
Close detail of hand-formed render and pointing in terracotta and lime on a London rear elevation by 2VP

From our Fieldway Crescent project — Norbury, SW16

Mortar is supposed to be the weakest part of a wall. When the pointing is harder than the brick — which is what a cement mix on a soft London stock does — the wall stops decaying through the joint and starts decaying through the brick face instead. A joint raked out to 10mm and refilled is maintenance. A spalled brick face is not.

That single idea decides most repointing arguments, and it is why "it looks tidier" is a bad reason to repoint and "the faces are shelling" is an urgent one.

First: has it actually failed?

Three checks, none needing scaffold.

  1. 01Rake a joint with a key. Run a key or a screwdriver along the mortar. Sound mortar resists. If it powders, or you can pull out more than about five millimetres by hand, the binder has gone and that elevation is a candidate.
  2. 02Look at the bricks, not the joints. Crumbling arrises, or faces shelling off in flakes while the mortar stands proud of them, means the mortar is harder than the brick. The wall is eroding through the brick because the mortar will not let it erode through the joint.
  3. 03Find out whether it is a crack or a joint. A straight vertical or stepped crack running through BOTH brick and mortar is movement, not pointing. Repointing it conceals the evidence and the cause continues underneath.
The one that is not a repointing job

A crack that crosses bricks as well as joints is structural. Filling it makes the wall look repaired and removes the only thing anyone could have monitored. If a crack is wider at one end, or steps diagonally, get it looked at before anyone mixes mortar — see cracks above windows and doors and, where movement is the concern, underpinning explained.

What the regulations actually give you

There is no Approved Document that says "repoint your house like this" — repointing an existing wall is usually maintenance rather than building work. But the documents do publish the figures a specification should be arguing with, and they are the numbers to hold a quote against.

The published figures a pointing or render specification sits next to
WhatThe requirementSource
Render mix over brickworkOne part cement, one part lime, six parts well-graded sharp sand (1:1:6) — or 1:0.5:4 for dense concrete aggregate blocks.Approved Document C, §5.9
Joint rake-out depth before renderingJoints raked out to at least 10mm where the wall is to be rendered.Approved Document C, §5.9
Solid wall resistance to driving rainBrickwork or stonework at least 328mm thick, dense aggregate blockwork 250mm, lightweight or AAC blockwork 215mm — plus rendering in two coats totalling at least 20mm with a scraped or textured finish.Approved Document C, §5.8
Where CEMENT mortar is the right answerA damp-proof course may be engineering bricks or slates in cement mortar — an intentionally impermeable barrier, which is the opposite of what a wall face wants.Approved Document C, §5.5(a)
Damp-proof course heightOn an external wall the DPC should be at least 150mm above the level of the adjoining ground.Approved Document C, §5.5(b)
Masonry unit standardsClay BS EN 771-1, calcium silicate 771-2, concrete 771-3, aerated concrete 771-4, manufactured stone 771-5 — properly bonded and solidly put together with mortar.Approved Document A, §2C20
Engineering brick classesClass B: compressive strength 75 N/mm² or more, water absorption 7% or less. Class A: 125 N/mm² and 4.5%. (UK National Annex, not AD A itself.)BS EN 771-1 UK NA

Approved Documents are statutory guidance to the Building Regulations 2010 for England. Compliance is judged against the Requirements in Schedule 1; the Approved Document shows one way of meeting them. Your building control body has the final word on your specific building.

Read the fourth row against the first. The same document that specifies a lime-containing mix for a render backing names cement mortar for a damp-proof course — because a DPC's job is to stop water and a wall face's job is to let it out. Cement is not a worse material; it is a material for a different job, used in the wrong place on most of London's solid-wall stock.

Lime or cement, decided properly

Soft solid-wall stock, Victorian or Edwardian. A lime-containing mix is normally right. It is weaker and more permeable than the brick, so the joint erodes first and the brick face survives. That is the whole design: the sacrificial part should be the replaceable part.
Hard brick, or exposed and driven-rain elevations. A stronger mix can be appropriate, and the exposure grading matters more than the era. This is a judgement about your wall, not a rule you can read off a web page.
A damp-proof course, or below ground. Cement, deliberately. Approved Document C names engineering bricks or slates in cement mortar for exactly this. Impermeability is the point.
Listed, or in a conservation area. The mix may not be yours to choose. Assume a specification will be required and settle it before pricing, not after — the same sequence as everything else in a consented building.

The two things that make repointing fail early

Depth. A joint scraped a few millimetres deep gives new mortar nothing to key into, and it drops out inside a few winters. The working rule is at least twice the joint width, cut square rather than feathered. Approved Document C's ten-millimetre rake-out for render is the nearest published figure and a reasonable floor.

Weather and water. Mortar cured in frost or in full summer sun does not gain its strength. Joints need brushing and damping before the mortar goes in, and protecting after. This is why a cheap quote in February and a good quote in February are different jobs.

What repointing will not fix

This is where most of the money gets wasted, because the symptom that sends people looking is usually damp.

A bridged damp-proof course. Approved Document C puts the DPC at least 150mm above adjoining ground. Raised paving, a new patio or a flowerbed against the wall defeats it, and no amount of pointing above the bridge helps. Look at the ground level first.
A wall too thin for its exposure. §5.8 wants brickwork at least 328mm thick, or render in two coats totalling 20mm, to resist driving rain. A 215mm solid wall on an exposed elevation is under-specified by design, and repointing does not thicken it.
Blocked or missing weep holes. On a cavity wall the water crossing the outer leaf is supposed to leave through the weep holes. Pointing them up is a common and expensive mistake — see the damp-proof course and weep holes guide.
Movement. A crack through bricks as well as joints is not a mortar problem, and closing it removes the evidence.

The mechanism behind the first and third is set out in damp-proof course and weep holes explained.

The south-west London angle

Solid-wall stock across Wimbledon Park, Southfields, Earlsfield and Putney is largely late Victorian and Edwardian, which means soft brick and originally lime-based joints. Much of it was repointed once in the second half of the twentieth century, in cement, because that was what everybody used. Those elevations are the ones now shelling their faces — and they are the reason the honest recommendation is often less work than expected on the joints and more on the ground levels and the rainwater goods.

What this costs, and why there is no number here

There is no price on this page, and that is deliberate. Our estimator prices eight project types and standalone repointing is not one of them — so any figure here would be typed rather than calculated, and this site's rule is that a displayed price derives from the pricing engine or it does not get displayed.

Two honest routes instead:

  • Repointing inside a wider job. If the brickwork is part of a renovation or an extension, it prices as external works within that scope, and the estimator will give you a real band for the whole project.
  • Repointing on its own. That needs somebody to look at the elevation, the exposure and the brick. It is a survey, not a calculator input.
Our interest, declared

We are a design-and-build contractor, and a whole-house renovation is a far larger contract than an elevation of pointing. So the incentive on this page runs towards telling you the brickwork is part of a bigger problem. Test that: ask for the three checks above to be shown to you on your own wall, and ask what the ground level is doing before you agree to any scaffold.

Before you accept a quote

  1. 01Get the mix written down. Cement, lime and sand proportions, and the sand. A quote that says repointing and gives no mix is a price for an unspecified job.
  2. 02Get the rake-out depth written down. At least twice the joint width, cut square. If it is not in the quote, it is not priced, and depth is the first thing to disappear on site.
  3. 03Establish it is pointing and not movement. Anything crossing the bricks gets looked at before mortar is mixed. A filled crack is a monitoring record destroyed.
  4. 04Check the ground level against the DPC. At least 150mm of brick between the damp-proof course and the adjoining ground. If a patio has buried it, that is the job, not the joints.
  5. 05Ask what happens to the weep holes. On a cavity wall they stay open. Confirm whoever is pointing knows which they are.
  6. 06Agree the weather rule. No mortar in frost or in beating sun, and joints damped before and protected after. Put it in writing so a delay is expected rather than argued about.
  7. 07Ask for a test panel. One square metre, cured, looked at in daylight before the rest is priced or started. Colour and joint profile are irreversible across an elevation.

The one line to take away

Look at the brick faces, not the joints. If the faces are going and the mortar is standing proud, the last repointing was too hard — and the job now is to put something softer back, not something neater.

2VP is the builder, not a marketplace: one contract, one named project lead, and no introducer fee stacked on the build cost. On a wall where the honest answer is often "the ground level, not the pointing", it matters that the person telling you is the person who would have done the work.

You pay weekly, against work already done10% to mobilise, then weekly against work already done — with 5% held past handover: 2.5% released at practical completion and 2.5% at the end of the 12-month defects period. Your money never gets ahead of the build.
Every variation priced and dated firstNothing is spent on a change until you have approved it in writing, with its cost and its effect on the date.
The measured survey is credited in fullIf you appoint us, the pre-contract survey fee comes off your contract rather than sitting on top of it.
A completion date, in the contractNot an estimate. It is written in, and only a variation you approve can move it.
Common questions

Straight answers

The 2VP Certainty Package

The home you actually want, finished on the date in the contract — and you watch every day of it happen from your phone.

Your number in 60 secondsItemised stage breakdown in 2 minutesSurvey within 7 days

You answer 3 questions. We do the drawings, planning, party wall, trades and snagging.

Before anything is signed
Full measured survey + 3D design visualisation
You see the finished room before you commit to building it
£1,500
RIBA architect design by Nick Elias
Concept, planning and technical drawings by one named architect
£8,000–£15,000
Completion date written into the contract
A date you can plan a life around, not 'TBC at build start'
Included
While we build
No variation without your written approval
Nothing is added to your bill that you did not sign for first
Included
Friday video walkthrough of your site, every week
You know what happened this week without driving over
£1,200/yr
One named project lead, one channel, 24-hour response
You never chase a company — you message a person
Included
Daily photo diary + client dashboard
Everything photographed before it is covered up
Included
Fixtures at our trade pricing, passed through at cost
Our discount is yours, not a margin we keep quiet about
10–20% on materials
After we hand over
6-month snagging visit
We come back once the house has moved and settled
£750
12-month workmanship warranty on second-fix fittings, signed by the trades
The people who built it are on the hook for it, by name
Included
Annual check-ins for 2 years
We come back. Every year. No charge.
Included
Our guarantee
We finish on the agreed date, or we pay you £500 for every week we are late.
The date is in the contract, and so is this. Only a variation you approve can move it.
What you are not risking
  • 10% to mobilise, then weekly against work already done — with 5% held past handover: 2.5% released at practical completion and 2.5% at the end of the 12-month defects period
  • £550 survey fee credited in full against your contract
  • Every variation priced and signed before a penny is spent
4.8★ from 16 Google reviews — including the 1-star, published in full.
Get my price in 60 seconds

No email needed to see your range. Quotes hold for 21 days, then materials re-price.

We are not the cheapest. If price is the only factor, we may not be the right fit — and that is fine.

Get my price in 60 secondsExtensionsExtension costs by areaBuilders in your areaAll cost guides
If this is your project

The home you actually want, finished on the date in the contract — and you watch every day of it happen from your phone.

How fast
  • Your number in 60 seconds
  • Itemised stage breakdown in 2 minutes
  • Survey within 7 days
What you do

You answer 3 questions. We do the drawings, planning, party wall, trades and snagging.

What protects you
  • 10% to mobilise, then weekly against work already done — with 5% held past handover: 2.5% released at practical completion and 2.5% at the end of the 12-month defects period
  • £550 survey fee credited in full against your contract
  • Every variation priced and signed before a penny is spent

The date is a term of the contract. We finish on the agreed date, or we pay you £500 for every week we are late.

Do not take our word for it

4.8 from 16 Google reviews

Every review is published in full on our reviews page, including the one-star. Google is the only platform we quote a rating for, because it is the only one we can evidence.

★★★★★
As a structural engineer, I've collaborated with 2VP Projects Ltd on several residential projects in London. Their attention to detail, proactive site management, and clear communication make every stage—from design to execution—smooth and efficient. It's rare to find a contractor who values both precision and professionalism at this level. A truly reliable partner.
Igors Smirnovs · Structural engineer we have worked with · June 2025
★★★★★
Great company to work with. Professional, reliable and easy to deal with. Vladimir and the team are always responsive, straightforward and genuinely care about doing things properly. I've had a very positive experience working with 2VP and would happily recommend them.
Sheen Delicatessen · Business client · August 2026
★★★★★
Extension went smoothly from start to finish. Communication was great throughout, and the team delivered exactly what we asked for. Thank you, 2VP!
Dan Martea · August 2026
Warranties and protections

What is covered, and by whom

A builder’s own guarantee is worth exactly as much as the company standing behind it. Here is what comes as standard, what you can add, and what has to come from somebody other than us — set out in full on our insurance and guarantee page.

Included in the contract
  • 12-month workmanship warranty on second-fix fittings
  • £5M public liability
  • £10M employer's liability
  • £2M professional indemnity
Optional, on request
  • HomePro insurance-backed guarantee, 10 years
  • Priced at 2.5% of the contract sum
  • Underwritten by an insurer, so it survives us
Not from us
  • 10-year structural warranty on a new dwelling (NHBC / LABC / Premier)
  • Professional fees — architect, engineer, building control
  • We will tell you when you need one rather than let you find out