House Extensions · London

The London extension
you don’t have to manage.

One architect. One builder. One contract. Rear, side-return, or wrap-around — delivered under one JCT contract with a daily 5pm report and a 12-month workmanship warranty on second-fix fittings.

£40k–£170k
Glazed infill to double-storey rear
+20%
Home value uplift
6–22 wks
On site, in writing
12 mo
Workmanship warranty
01
Itemised Quotation
Every line costed before we start, against the scope we surveyed. Variations are priced and signed by you before any spend.
02
Stage Payments on Milestones
Stage payments are tied to build milestones signed off by your project manager, not to calendar dates.
03
Daily On-Site Report
Every working day: photos, what was done, what's next. You'll never wonder what's happening on site.
04
12-Month Warranty · Second-Fix Fittings
Backed by the company that built it — not handed off to a third party. A 10-year HomePro insurance-backed guarantee is available on request, arranged with HomePro and paid directly to them at 2.5% of the contract value.
05
One Named PM, Start to Finish
From first sketch to final snag: one person, one mobile number, one accountable team.
What an Extension with 2VP looks like

One unused side return.
One quiet 10–22 weeks.
A whole new ground floor.

A London extension turns a cramped galley kitchen into the open-plan kitchen-diner that holds the family — without moving postcode. On a typical Victorian terrace it pays for itself the day you list it.

+25 m²
New floor area
A typical London single-storey rear or side-return extension adds 12–25 m² — enough for a generous kitchen-diner with island, plus a bay or roof-light over.
+20%
Home value uplift
Architecture for London puts a wrap-around at +20% home value. Side return +12–15%, two-storey rear +20–25% on a Victorian terrace.
10–22
Weeks on site
Glazed infill 6–8 wks · rear 10–14 · side return 10–14 · wrap-around 14–18 · two-storey 18–22. Fixed in writing before contract.
1
Contract, one team
No design-vs-builder ping-pong. Nick Elias Architects (RIBA Silver Medal) and 2VP's build team work under one signed agreement.
12 mo
Warranty in writing
Workmanship warranty backed by 2VP and signed by the trades who did the work. An optional 10-year HomePro guarantee — arranged on request, paid by you to HomePro at 2.5% of the contract — is enforceable against the underwriter even if 2VP ceased trading.
Five extension types

Five ways to extend. One sane process.

All costs include VAT, design, planning, structural engineer, and contingency.

01
Glazed Infill
£40k–£80k8–15 m²6–8 weeksPermitted Development
+
Right for you when

Fill a small gap between the original outrigger and the boundary wall. Maximum glass, minimum brickwork. Often the fastest way to open a kitchen to the garden without touching the main rear wall. Works beautifully on Victorian terraces with a side closet wing.

Cost incl. VAT£40k–£80k
Floor area8–15 m²
On site6–8 weeks
PlanningPermitted Development
Price this extension
02
Single-Storey RearMost popular
£55k–£90k15–25 m²10–14 weeksPermitted Development
+
Right for you when

Open up the back of the house — the classic London kitchen-diner extension. Full-width or partial, bi-fold or sliding doors to the garden. The most common 2VP extension across Fulham, Battersea, and Chiswick terraces.

Cost incl. VAT£55k–£90k
Floor area15–25 m²
On site10–14 weeks
PlanningPermitted Development
Price this extension
03
Side Return
£55k–£100k10–18 m²10–14 weeksPermitted Development
+
Right for you when

The narrow alley beside a Victorian terrace becomes part of your kitchen. Often combined with a rear extension for an L-shape ground floor. Transforms a dark galley kitchen into an airy open-plan space — without losing the garden.

Cost incl. VAT£55k–£100k
Floor area10–18 m²
On site10–14 weeks
PlanningPermitted Development
Price this extension
04
Wrap-Around
£75k–£140k25–40 m²14–18 weeksOften Full Planning
+
Right for you when

Side return + rear extension combined. Creates a large open-plan ground floor — the most transformative single extension type. Project #074: 36 m², inner London Victorian terrace, £128k incl. VAT, 16 weeks on site.

Cost incl. VAT£75k–£140k
Floor area25–40 m²
On site14–18 weeks
PlanningOften Full Planning
Price this extension
05
Double-Storey Rear
£90k–£170k30–50 m²16–22 weeksFull Planning required
+
Right for you when

Add a bedroom and bathroom above the ground-floor extension. Best value per m² when you want both a bigger kitchen and more bedrooms. Planning wait is typically 12 weeks — we handle the full application.

Cost incl. VAT£90k–£170k
Floor area30–50 m²
On site16–22 weeks
PlanningFull Planning required
Price this extension
Cost breakdown

Where your £95,000 goes.

Typical wrap-around extension in inner London. Your contract is itemised line-by-line — every number agreed before we break ground.

Real project · #074
Wrap-Around, Inner London
Area
36 m²
Location
Victorian terrace, SW11
Contract
£128,000 incl. VAT
On site
16 weeks
Structure, groundworks & steelwork£28,500
Roofing, glazing & bi-fold doors£19,000
MEP — electrics, plumbing, heating£15,200
Joinery, plastering & decoration£13,300
Design, planning & engineers£9,500
Contingency (built in)£5,700
Scaffolding, skips & logistics£3,800
Total incl. VAT£95,000
Real Extension Projects · #074 · #086 · #112

Project #074
Inner London · Victorian terrace.

A 36 m² wrap-around (side return + rear) on a 90 m² Victorian inner-London terrace — opening kitchen, dining and family room into one volume with bi-folds to garden, full-width rooflight and bespoke kitchen. Priced against the surveyed scope, with variations signed before spend.

£128k
incl VAT
36 m²
new floor
16 wk
on site
0
variations
  • Side-return + 4 m rear — full-width structural goalpost, reinforced foundations, party-wall awards (× 2)
  • 5-pane aluminium bi-folds to rear, frameless 2.4 m × 1.6 m roof lantern over island
  • Bespoke shaker kitchen with stone island, integrated appliances
  • Polished concrete floor with wet UFH on new slab, level threshold to porcelain patio
  • JCT Minor Works contract · daily on-site report from week 1 to handover
How a 2VP Extension is built

Four steps.
One signed agreement.

The same four steps every London extension goes through with us. No two-companies-passing-notes.

STEP 01
Get clear in 2 minutes
The calculator returns a London-zoned range and shows real 2VP extensions at that range. No email gate, no follow-up unless you ask.
60 seconds
STEP 02
Meet the people who'll build it
A 90-minute site visit. Vladimir, Nick (Architect) and your Project Manager — on a single call. Not a roster. Not three quotes from strangers.
Week 1
STEP 03
Lock the quote, sign the contract
Itemised line-by-line scope from our in-house QS, JCT Minor Works contract, stage payments tied to milestones. Planning & party-wall handled before site mobilisation.
Weeks 2–14 (design & planning)
STEP 04
Watch it happen
Daily report at 5pm: photos, what was done, what's next. Independent QA at every stage. Hand-over with the 12-month workmanship warranty on second-fix fittings and every completion certificate in your hand.
10–22 weeks on site
Transparency

What’s in the price. What isn’t.

Included

  • Full architectural design (Nick Elias Architects, RIBA Silver Medal)
  • Planning application & pre-application meeting
  • Structural engineer & party-wall surveyor
  • Building Regulations & Control
  • All groundworks & foundations
  • Structural steelwork
  • Roofing, insulation, waterproofing & gutters
  • Bi-fold or sliding doors (supply & install)
  • 1st & 2nd fix electrics & plumbing
  • Plastering & decoration to white primer
  • Scaffolding, skips & parking suspensions
  • 12-month workmanship warranty on second-fix fittings (optional 10-year HomePro structural cover at 2.5%)
  • 12-month workmanship warranty on second-fix fittings

Not included

  • Kitchen supply & fit (quoted separately — ask us)
  • Furniture & soft furnishings
  • Bespoke joinery (available as add-on)
  • Underfloor heating (available as add-on)
  • External landscaping & paving
  • Specialist AV & smart home wiring
  • Owner-supplied fixtures or fittings
  • CIL (Community Infrastructure Levy)

Every item is specified line-by-line before you sign, priced against the scope we surveyed.

Optional upgrades

Extras you price before you sign.

Underfloor heating
+£4k–£8k
Electric mat, thermostat & controls
Bespoke kitchen install
+£8k–£25k
Supply & fit, any supplier
Sliding door upgrade
+£3k–£6k
Slimmer frames, larger spans
Roof lantern / rooflight
+£3k–£7k
Fixed or opening, VELUX or bespoke
Juliet balcony
+£3k–£6k
Glazed balustrade, PD compliant
Smart home wiring
+£2k–£5k
Cat6, speaker prep, AV sockets

All add-ons priced at contract stage — no surprises mid-build.

What clients say

Extension went smoothly from start to finish. Communication was great throughout, and the team delivered exactly what we asked for. Thank you, 2VP!

Dan Martea
Google review · August 2026

A big thank you to the 2VP team for my new kitchen. They carried out a complete renovation, including the fronts, and the quality of the work shows in every detail. Honest, reliable and true to their word. Would recommend to anyone looking for a team they can trust!

Alexandru Visan
Google review · August 2026

Great company to work with. Professional, reliable and easy to deal with. Vladimir and the team are always responsive, straightforward and genuinely care about doing things properly. I've had a very positive experience working with 2VP and would happily recommend them.

Sheen Delicatessen
Business client · August 2026
48 hrs
Designer answer SLA
Every M2 Manager question on site goes back to Nick — written reply inside 48 working hours. No silent week. No drift while we wait.
1 system
Variations & decisions
Every change logged the same way: written description, before-and-after price, decision deadline, signed before work moves. No verbal Friday agreements.
Who decides what on your extension

Every extension has live questions.
What matters is how fast we answer them.

An extension is two hundred small decisions in a row — the height of the slab, where the steel sits, which side the bi-folds open, whether the rooflight clears the existing parapet. The extensions that age well are the ones where every Friday question got an answer the same day. We built that answer system in from the start.

We don’t like to spend too much time talking. We like to agree, and do.— Vladimir Castravet, founder

Nick is on every concept. Vladimir is on every site. The 48-hour clock and the Variations System are the bridge between the two — so what was drawn is what gets built.

Where we build London extensions

59 prime London areas, one Fulham studio.

2VP’s studio is on Dawes Road, SW6. We carry a full understanding of borough planning regimes, conservation overlays, party-wall density and parking-suspension rates across these zones.

Fulham & West London
  • Fulham · SW6
  • Parsons Green · SW6
  • Sands End
  • Chiswick · W4
  • Hammersmith · W6
  • West Kensington · W14
  • Shepherd's Bush · W12
  • Acton · W3
Prime Central
  • Chelsea · SW3
  • South Kensington · SW7
  • Kensington · W8
  • Notting Hill · W11
  • Holland Park · W11
  • Paddington · W2
  • Belgravia · SW1X
  • Marylebone · W1
South West & South
  • Battersea · SW11
  • Clapham · SW4
  • Putney · SW15
  • Wandsworth · SW18
  • Wimbledon · SW19
  • Barnes · Richmond
  • Brixton · SW2
  • Vauxhall · Nine Elms

Don’t see your postcode? Tell us where you are — we work across all of prime London.

Frequently asked questions about Extensions

Seven questions every London homeowner asks.

Why one company instead of three quotes?+
Three quotes from strangers means three companies that can blame each other when something cracks. With 2VP, the team that prices the extension also designs it, builds it, and signs the 12-month workmanship warranty on second-fix fittings. One mobile number from first sketch to final snag — and the person you meet on day one is the person whose name is on that warranty on day 365.
What if 2VP can't finish my extension?+
Work is contracted under JCT Minor Works, which sets out how the contract is administered if either party cannot continue. There is no completion bond — that claim was on this page and it was wrong. What is available is the 10-year HomePro insurance-backed guarantee: you arrange it with HomePro on request and pay them directly at 2.5% of the contract value, and because it is underwritten independently it stays enforceable against the underwriter even if 2VP ceased trading. Ask us for the contract and the HomePro policy before you sign.
What protects my money?+
Stage payments are tied to build milestones rather than calendar dates, and you pay 2VP directly at each stage — a payment schedule, not an escrow arrangement. A 10% deposit at signing, then weekly against work already done, with 5% held back to the end of the twelve-month defects period. JCT Minor Works contract. Itemised line-by-line scope. £17m total insurance cover (Public Liability £5m, Employer's £10m, Professional Indemnity £2m, plus Contract Works All-Risk and Product Liability) · full certificates available before contract.
How does 2VP vet its team?+
The same trades on every 2VP project — not an open call. Lead carpenter, electrician, plumber, plasterer, decorator: all on rolling annual contracts, all sign the 12-month workmanship warranty on second-fix fittings alongside us. Architectural design is in formal partnership with Nick Elias Architects (RIBA Silver Medal). Every build is HomePro registered and signed off by Building Control.
What's covered by the warranty?+
One as standard, one on request. As standard: a 12-month workmanship warranty on second-fix fittings on second-fix fittings, backed by 2VP and signed by the trades who did the work — it covers anything we have installed that fails to perform as specified, including all snagging. On request: a 10-year HomePro insurance-backed structural guarantee, which you arrange with HomePro and pay them directly at 2.5% of the contract value. It is underwritten independently, so it stays enforceable against the underwriter even if 2VP ceased trading. Manufacturer warranties on bi-folds, rooflights, kitchen appliances etc. are passed across separately.
How will I know what's happening on site?+
A daily on-site report at 5pm: photos taken at 09:00 and 17:00, captions, who was on site, what was done, what's next. Sent to your WhatsApp + email. Plus a written 48-hour SLA on every M2 Manager question. Plus QA-gate sign-off photos before any stage payment moves. You'll never wonder.
The 2VP Certainty Package · Extensions

The home you actually want, finished on the date in the contract — and you watch every day of it happen from your phone.

Your number in 60 secondsItemised stage breakdown in 2 minutesSurvey within 7 days

You answer 3 questions. We do the drawings, planning, party wall, trades and snagging.

Before anything is signed
Full measured survey + 3D design visualisation
You see the finished room before you commit to building it
£1,500
RIBA architect design by Nick Elias
Concept, planning and technical drawings by one named architect
£8,000–£15,000
Completion date written into the contract
A date you can plan a life around, not 'TBC at build start'
Included
While we build
No variation without your written approval
Nothing is added to your bill that you did not sign for first
Included
Friday video walkthrough of your site, every week
You know what happened this week without driving over
£1,200/yr
One named project lead, one channel, 24-hour response
You never chase a company — you message a person
Included
Daily photo diary + client dashboard
Everything photographed before it is covered up
Included
Fixtures at our trade pricing, passed through at cost
Our discount is yours, not a margin we keep quiet about
10–20% on materials
After we hand over
6-month snagging visit
We come back once the house has moved and settled
£750
12-month workmanship warranty on second-fix fittings, signed by the trades
The people who built it are on the hook for it, by name
Included
Annual check-ins for 2 years
We come back. Every year. No charge.
Included
Our guarantee
We finish on the agreed date, or we pay you £500 for every week we are late.
The date is in the contract, and so is this. Only a variation you approve can move it.
What you are not risking
  • 10% to mobilise, then weekly against work already done — with 5% held past handover: 2.5% released at practical completion and 2.5% at the end of the 12-month defects period
  • £550 survey fee credited in full against your contract
  • Every variation priced and signed before a penny is spent
4.8★ from 16 Google reviews — including the 1-star, published in full.
Get my price in 60 seconds

No email needed to see your range. Quotes hold for 21 days, then materials re-price.

We are not the cheapest. If price is the only factor, we may not be the right fit — and that is fine.

Questions every homeowner asks.

Not the question you had? Every question homeowners ask, answered in full — including the ones where the honest answer is that nobody can do what you are hoping for.

Start your extension

Know what your extension costs —
before you brief an architect.

60-second estimate. Real numbers from real 2VP projects. No obligation.

Get your estimate →