How we build
The whole arc of a contract, from the day you sign to the day it closes a year after you move back in — what you get asked for, what you get handed, and what you can see while it runs. Then eleven questions a homeowner asks before signing, answered one page at a time. Written down here so you are not asking us to remember it later.
Signature to final completion.
Eight steps, two of which are yours. The dates come from your programme and the amounts from your payment schedule — both are in the contract before you sign, not described to you afterwards.
Contract signed
Day 0A JCT Minor Works contract with the measured scope priced line by line, a written exclusions list, and a programme carrying your completion date. The date is the one the late-delivery guarantee is written against.
10% to mobiliseOn site
Your programme — the contract names the datesA named project manager, a daily photo report from the foreman, and a written weekly report. Every variation is priced AND dated before you approve it, so a change never arrives as a surprise on an invoice.
Weekly, against work already donePractical Completion
The day the work is usableYou can live in it, and the building is handed back to you. We walk it with you rather than emailing you a form.
You inspect and raise your snagging list2.5% releasedSnagging cleared
After your listWe work through your list and show you each item closed. Building control carries out its final inspection at this stage.
Certificates issued
At handoverThe statutory paperwork, submitted by us and issued in your name — not a promise to send it on later, when the trade has moved on.
Handover pack
At handoverThe record of what is behind your walls, and how to look after it: as-built drawings, the photographic record of services before they were covered, product warranties, appliance manuals and the maintenance schedule for anything that has one.
Defects Liability Period
The 12 months after Practical CompletionYou live in the house through a full cycle of weather and heating. Anything that moves, we come back for.
2.5% still heldFinal Completion
End of the 12 monthsThe contract closes. Not when we leave site — a year after you moved back in.
You raise a second snagging list2.5% released
The completion pack.
Reasonable to make a condition of the final payment, and we would rather you did. Chasing certificates two years later, when the trade has moved on, is the situation this prevents.
- Building control completion certificate
We submit the application, book and attend every notifiable inspection, and hand you the final certificate.
- Electrical installation certificate
Part P notification and the installation certificate for the work carried out.
Any notifiable electrical work
- Gas safety and commissioning records
Gas Safe registered engineer's certificate and the commissioning record for the appliance.
Any gas work
- FENSA or equivalent
Glazing compliance for replacement windows and external doors.
Replacement glazing
- Structural engineer's sign-off
The design certificate and any inspection sign-off for steel and structural openings.
Structural work
- Party wall award and schedule of condition
The award and the dated condition record of the neighbouring property.
Where a party wall notice was served
- As-built drawings and the photographic record
Services, structural connections, insulation and drainage, photographed before they were covered — so somebody drilling that wall in 2033 knows what is behind it.
- Warranties, manuals and finish schedules
Registered product warranties, appliance manuals, the maintenance regime, and the paint and tile schedules with batch references.
You watch it happen.
Every project gets a private dashboard with five panels. It is where your snagging list lives, where a variation gets priced before you approve it, and where the foreman’s photos land every working day.
Variations
Every change, priced and dated before you approve it. You accept or decline in the panel, and the decision is recorded with the date you made it.
Issues
Anything open, who it is with, and what it is waiting on. Your snagging list lives here at Practical Completion rather than in an email thread.
Payments
The schedule generated from your programme — what is due, when, and against which completed work. 5% of it sits past handover.
Reports
The written weekly report from your project manager: what moved, what is next, and what we need a decision on.
Daily photos
The foreman's photo report, every working day. It is also the record of what went in behind the plaster.
Eleven questions, answered in full.
Start with the range, not the sales call.
The estimator gives you a band in a couple of minutes and tells you how wide it is and why. Nothing here needs a phone call first.