Kitchen Renovation Cost in London 2026

The build stack for a London kitchen is £8,807 and barely moves. The product stack swings six-fold. Which half your quote is arguing about decides everything.

By Vladimir Castravet·
Completed London kitchen renovation by 2VP — sage-green units, marble island, black pendant lights and herringbone flooring

The build work on a 5.2-metre London kitchen is £8,807 net of VAT — and it barely moves between specifications. The cabinetry and appliances sitting on top of it can swing by a factor of six. Almost every argument about a kitchen quote is an argument about which of those two halves is being discussed.

A kitchen is the one room where the price a showroom quotes and the price a builder quotes are not the same kind of document. One is mostly product with some fitting; the other is mostly build with a product allowance. Put side by side without splitting them, they cannot be compared at all.

So this page splits them. How we run renovations covers the contract side, the estimator prices your own room from the same rate library these figures come from, and the bathroom cost guide does the same exercise one room over.

The room this page prices

A 14 m² kitchen with 5.2 linear metres of run. Existing layout kept — sink and hob stay where the services already are. Full strip-out, new floor, new ceiling, six downlights, eight electrical points, six appliances, a quartz worktop and a tiled splashback.

LineQuantityRateTotal
Waste — 6-yard skip1 no.£450.00£450.00
Strip-out — existing kitchen and floor finish14 m²£15.00£210.00
Kitchen first and second fix — plumbing, gas cap, waste1 lot£540.00£540.00
Electrical points, first and second fix8 no.£95.00£760.00
Downlights6 no.£140.00£840.00
Kitchen units — install only, client-supplied5.2 lm£110.00£572.00
Worktop — quartz, supplied and fitted5.2 lm£380.00£1,976.00
Splashback tiling3 m²£95.00£285.00
Appliance installation6 no.£95.00£570.00
Floor tiling, standard format14 m²£95.00£1,330.00
Plasterboard ceiling14 m²£38.00£532.00
Skim, 3 mm14 m²£26.00£364.00
Paint, walls and ceiling14 m²£27.00£378.00
Build stack, net — VAT in addition£8,807.00

Rates are our own estimator library at Balanced tier, Outer London base.

This table does not contain a kitchen. It contains everything needed to receive one: the services, the surfaces, the labour to install, and the worktop that has to be templated to whatever arrives. The cabinetry itself is the next section, and it is the one that moves.

The whole point of this page

£8,807 of build, and about £1,694 per linear metre of it. That figure is roughly the same whether the units that land on site cost £4,000 or £40,000 — which is why a quote that bundles the two into one number tells you almost nothing.

Where the money actually varies

Install only — £110 per linear metre You buy the units, we fit them. £572 on this run. It transfers the supply risk to you: a missing end panel or a damaged door on delivery day is yours to chase, and it stops the programme either way.
Supplied and installed — £250 per linear metre £1,300 on this run, so the supply element is about £140 per metre at this tier. One party is responsible for what arrives and for what it looks like once fitted, which is the part that matters on the day a door does not line up.
Bespoke, made in a workshop A different category rather than a higher tier. Made to the room rather than to a module grid, so it fills awkward returns and full-height runs that carcass systems cannot. Kitchens and joinery come from our own Selection.Works rather than being subcontracted out, which is why the fitting and the making answer to the same programme.

The worktop moves independently of all of that. Quartz is £380 per linear metre supplied and fitted; natural stone is £580 — £1,040 more on this run for the same length of the same kitchen. And it is templated only after the units are installed, then takes a further week or two, which is why it sets the end of the programme rather than the middle.

Where this sits against our £16,950 kitchen package

We publish a set-scope Kitchen Renovation package at £16,950 including VAT, with the cabinetry made in our own workshop and supplied. It is not a cheaper version of this page — it is a different product, priced from a rebuilt estimate shell rather than from the bespoke engine.

The package carries a scope cap: the moment a job needs strip-to-brick work, structural change or services relocation, it exits the package and becomes a bespoke estimate, which is what the table above prices. If your kitchen fits the package scope, take the package.

The rules that price themselves in

Kitchen requirements — the clause behind each one
WhatThe requirementSource
Extract ventilation, adjacent to the hob30 litres per second, intermittent, where the extract is adjacent to the hob.Approved Document F Volume 1 (2021), Table 1.1
Extract ventilation, elsewhere in the room60 litres per second, intermittent, where it is not adjacent to the hob.Approved Document F Volume 1 (2021), Table 1.1
A new circuit or consumer unitNotifiable wherever in the dwelling it is — which most full kitchen rewires involve.Building Regulations 2010, regulation 12(6A)(a) and (b)
Gas workAny work on a gas appliance or its pipework must be carried out by a Gas Safe registered engineer, and moving an appliance is notifiable in its own right.Gas Safety (Installation and Use) Regulations 1998
Waste and trap sealsA sink or appliance waste takes a 40 mm pipe with a 75 mm seal; a washing machine or dishwasher connects through a trapped standpipe or an appliance branch.Approved Document H (2002 as amended), Table 1
AsbestosIn a home built or refurbished before 2000, reasonable steps must be taken to identify asbestos-containing materials before work liable to disturb them — which includes lifting an old vinyl floor and its adhesive.Control of Asbestos Regulations 2012, reg. 5

Approved Documents are statutory guidance to the Building Regulations 2010 for England. Compliance is judged against the Requirements in Schedule 1; the Approved Document shows one way of meeting them. Your building control body has the final word on your specific building.

Approved Documents are statutory guidance. Compliance is judged against the Requirements in Schedule 1 to the Building Regulations 2010, and your building control body has the final word on your building.

The extract rate is a design decision, not a fitting

Thirty litres per second adjacent to the hob, or sixty where it is not. That doubling is the single most consequential line in the table above, because it is decided by where the hob goes — usually on an island, usually for reasons that have nothing to do with ventilation. A downdraft extract is £450 on top and brings its own duct route. Settle the hob position before the layout, not after.

What the quote will not tell you unless you ask

  1. 01Split it into build and product. Build is the table above. Product is the cabinetry, the worktop material and the appliances. A single bundled figure cannot be compared with anything, and splitting it is the fastest way to see which quote is actually cheaper.
  2. 02Ask what the appliance allowance assumes. Six appliances at £95 covers installation. It does not buy them. An allowance stated as a lump sum with no products named is the line that moves after you have committed.
  3. 03Confirm the lead times before the strip-out. Made-to-order cabinetry runs eight to twelve weeks, and the worktop is templated only once the units are in, then a further one to two weeks. Order both before anything comes out, or you will be living around a working strip-out.
  4. 04Establish whether the services move. Keeping the sink and hob where they are keeps this table honest. Moving them means new waste runs, new falls and possibly a new gas run — none of which are in the figure above.
  5. 05Ask where the extract discharges. An extract with nowhere to go is a redesign, not a fitting. On an island it is a floor route; on an external wall it is a core drill and a terminal.

The one number to take away

The build is £8,807, and it is roughly the same kitchen-shaped hole whatever you put in it. Everything else you are being quoted is product — and product is the part you can still change your mind about after the contract is signed.

Common questions

Straight answers

The 2VP Certainty Package

The home you actually want, finished on the date in the contract — and you watch every day of it happen from your phone.

Your number in 60 secondsItemised stage breakdown in 2 minutesSurvey within 7 days

You answer 3 questions. We do the drawings, planning, party wall, trades and snagging.

Before anything is signed
Full measured survey + 3D design visualisation
You see the finished room before you commit to building it
£1,500
RIBA architect design by Nick Elias
Concept, planning and technical drawings by one named architect
£8,000–£15,000
Completion date written into the contract
A date you can plan a life around, not 'TBC at build start'
Included
While we build
No variation without your written approval
Nothing is added to your bill that you did not sign for first
Included
Friday video walkthrough of your site, every week
You know what happened this week without driving over
£1,200/yr
One named project lead, one channel, 24-hour response
You never chase a company — you message a person
Included
Daily photo diary + client dashboard
Everything photographed before it is covered up
Included
Fixtures at our trade pricing, passed through at cost
Our discount is yours, not a margin we keep quiet about
10–20% on materials
After we hand over
6-month snagging visit
We come back once the house has moved and settled
£750
12-month workmanship warranty on second-fix fittings, signed by the trades
The people who built it are on the hook for it, by name
Included
Annual check-ins for 2 years
We come back. Every year. No charge.
Included
Our guarantee
We finish on the agreed date, or we pay you £500 for every week we are late.
The date is in the contract, and so is this. Only a variation you approve can move it.
What you are not risking
  • 10% to mobilise, then weekly against work already done — with 5% held past handover: 2.5% released at practical completion and 2.5% at the end of the 12-month defects period
  • £550 survey fee credited in full against your contract
  • Every variation priced and signed before a penny is spent
4.8★ from 16 Google reviews — including the 1-star, published in full.
Get my price in 60 seconds

No email needed to see your range. Quotes hold for 21 days, then materials re-price.

We are not the cheapest. If price is the only factor, we may not be the right fit — and that is fine.

Get my price in 60 secondsFull renovationsRenovation costs by areaBuilders in your areaAll cost guides
If this is your project

The home you actually want, finished on the date in the contract — and you watch every day of it happen from your phone.

How fast
  • Your number in 60 seconds
  • Itemised stage breakdown in 2 minutes
  • Survey within 7 days
What you do

You answer 3 questions. We do the drawings, planning, party wall, trades and snagging.

What protects you
  • 10% to mobilise, then weekly against work already done — with 5% held past handover: 2.5% released at practical completion and 2.5% at the end of the 12-month defects period
  • £550 survey fee credited in full against your contract
  • Every variation priced and signed before a penny is spent

The date is a term of the contract. We finish on the agreed date, or we pay you £500 for every week we are late.

Do not take our word for it

4.8 from 16 Google reviews

Every review is published in full on our reviews page, including the one-star. Google is the only platform we quote a rating for, because it is the only one we can evidence.

★★★★★
As a structural engineer, I've collaborated with 2VP Projects Ltd on several residential projects in London. Their attention to detail, proactive site management, and clear communication make every stage—from design to execution—smooth and efficient. It's rare to find a contractor who values both precision and professionalism at this level. A truly reliable partner.
Igors Smirnovs · Structural engineer we have worked with · June 2025
★★★★★
Great company to work with. Professional, reliable and easy to deal with. Vladimir and the team are always responsive, straightforward and genuinely care about doing things properly. I've had a very positive experience working with 2VP and would happily recommend them.
Sheen Delicatessen · Business client · August 2026
★★★★★
Extension went smoothly from start to finish. Communication was great throughout, and the team delivered exactly what we asked for. Thank you, 2VP!
Dan Martea · August 2026
Warranties and protections

What is covered, and by whom

A builder’s own guarantee is worth exactly as much as the company standing behind it. Here is what comes as standard, what you can add, and what has to come from somebody other than us — set out in full on our insurance and guarantee page.

Included in the contract
  • 12-month workmanship warranty on second-fix fittings
  • £5M public liability
  • £10M employer's liability
  • £2M professional indemnity
Optional, on request
  • HomePro insurance-backed guarantee, 10 years
  • Priced at 2.5% of the contract sum
  • Underwritten by an insurer, so it survives us
Not from us
  • 10-year structural warranty on a new dwelling (NHBC / LABC / Premier)
  • Professional fees — architect, engineer, building control
  • We will tell you when you need one rather than let you find out