House Extensions in London: Types, Planning and How to Compare Quotes
Rear, side return, wrap-around or double-storey: what each London extension type costs, when it needs planning, and how to compare two quotes like for like.
- 4.8★ Google · 17 reviews
- £500 per week if we finish late
- £17m insurance cover · £5m public liability
- 12-month warranty on second-fix fittings · HomePro registered
- £550 survey credited in full

A single-storey rear extension in London costs £51,840–£111,600 including VAT in 2026, for 18–30 m² at outer-London rates, and a double-storey rear £93,600–£198,000. Size and finish move the figure inside that range, and postcode moves the range itself. This post covers the types, the planning and how to compare quotes. Our extension cost guide is where the prices live, by type, size, finish and postcode, and the estimator prices your own footprint.
The five types, and what each costs
These are the calculator's bands for each type at the size and finish it is normally built to. They include VAT and are at outer-London rates; prime central postcodes cost more, and the cost guide shows by how much.
| Extension type | London 2026, inc VAT | Scope behind the band |
|---|---|---|
| Side-return infill | £31,680–£69,600 | 12–20 m², builder's to balanced finish |
| Single-storey rear extension | £51,840–£111,600 | 18–30 m², builder's to balanced finish |
| Wrap-around (rear + side return) | £90,720–£183,600 | 28–45 m², builder's to balanced finish |
| Double-storey rear | £93,600–£198,000 | 30–50 m², builder's to balanced finish |
| Large rear / kitchen-diner | £111,600–£237,600 | 30–45 m², balanced to signature finish |
A band this wide is honest about how little a web page knows. Measure the floor area, choose a finish and give a postcode, and the cost guide narrows it.
What moves the price
Size
The engine prices per square metre, so a larger extension costs more in proportion. The cost guide's size ladder shows the same finish at five sizes.
Finish
The specification inside the shell is the biggest variable within any one type. The cost guide prices the same extension at three finish grades.
The ground
Most Victorian terraces sit on shallow footings. If the ground or nearby trees mean the new foundation has to go deeper, the cost moves with it — why foundation depth changes on site explains how, and underpinning explained covers the case where the existing house needs it too.
Glazing
The rear glazing is often the largest single choice in an open-plan extension. Extension glazing costs compares the options.
Postcode
The same extension costs more in a prime central postcode than in an outer borough. The cost guide publishes the four build zones the calculator uses.
The Victorian side return
Many Victorian terraced houses have a narrow passage running alongside the back of the ground floor. It is usually a dark corridor to the garden. A side return extension fills it, taking the kitchen to the full width of the plot. On its own it costs £31,680–£69,600 for 12–20 m²; combined with a rear extension as a wrap-around it is £90,720–£183,600 for 28–45 m².
The side return extension guide covers the structure, the roof and the glazing in detail.
Planning permission
Permitted development
A single-storey rear extension up to 3m deep on a terraced or semi-detached house, or 4m on a detached one, and no more than 4m high, can usually be built under permitted development, confirmed with a lawful development certificate.
The larger home extension scheme, with neighbour consultation, extends this to 6m or 8m.
When you need full planning permission
- the extension is to a side elevation visible from the street
- you want a double-storey extension, which usually needs planning on a London terrace
- the property is in a conservation area or an Article 4 Direction area
- the property is listed
Permitted development rules for extensions sets out the limits in full.
Building regulations and the neighbours
Planning decides whether you may build an extension; the Building Regulations decide how. Three parts matter most.
- Structure (Approved Document A). New foundations, and the steels that carry the house where the back wall is opened, are designed by a structural engineer. Ground conditions decide how deep the foundations go.
- Glazing (Approved Document L). The area of windows, rooflights and glazed doors in an extension is limited to 25% of the extension's floor area, plus the area of any windows or doors the extension covers up. A design with more glass than that has to show, by calculation, that the house still meets the energy standard some other way.
- Drainage (Approved Document H). Many London rear gardens carry a shared sewer. Building over or near one needs the water company's agreement before work starts, which is a question to ask at survey rather than at excavation.
The Party Wall etc. Act 1996 usually applies as well. Building a new wall on the boundary, or digging foundations within 3 metres of a neighbour's and deeper than theirs, needs notice served at least one month before that work starts. On a terrace that can mean both neighbours.
How to compare two quotes
When comparing extension quotes, make sure they describe the same building:
- What glazing is specified? A low quote often prices the doors at the minimum.
- Is underfloor heating included? It is often priced separately.
- What foundation depth is assumed? If a quote does not mention ground conditions, it may be assuming easier ground than yours.
- Is the kitchen included? Ask, and get the answer in writing.
- Is VAT included? Most extension work carries VAT at 20%.
2VP prices against a JCT Minor Works contract, itemised stage by stage, with a site risk allowance already inside the rates rather than added at the end. The scope you sign is the scope we price, and nothing is added to it without your written approval first.
Before you compare quotes at all, it is worth knowing which procurement route produced them: design and build versus a traditional contract decides who pays when the drawings and the building disagree, and that is a larger number over a project than any single line above.
Get a band on your own extension
The estimator gives a range for your own footprint in about two minutes, built from the same rates as every figure on this page, and the extension cost guide shows every stage of a typical rear extension, line by line.
Straight answers
The home you actually want, finished on the date in the contract — and you watch every day of it happen from your phone.
We finish on the agreed date, or we pay you £500 for every week we are late.
The date is in the contract, and so is this. Only a variation you approve can move it.
Everything included, line by line
- 10% to mobilise, then weekly against work already done — with 5% held past handover: 2.5% released at practical completion and 2.5% at the end of the 12-month defects period
- £550 survey fee credited in full against your contract
- Every variation priced and signed before a penny is spent
Your range appears as soon as you add your email. Quotes hold for 21 days, then materials re-price.
4.8★ from 17 Google reviews — including the 1-star, published in full. We are not the cheapest. If price is the only factor, we may not be the right fit — and that is fine.


