Why Foundation Depth Changes on Site — and Why That Is Honest

The drawing proposes a depth. The ground decides it and building control confirms it in the open trench — which is why depth is the most common genuine variation.

By Vladimir Castravet·

Foundation depth is not fixed on the drawing. The Approved Documents set a frost minimum of 0.45m, but most of London sits on shrinkable clay where the figure becomes 0.75m, 0.9m or 1.0m — deeper still near trees — and the real number is confirmed by a building control inspector standing in the open trench. That is why depth is the most common genuine variation on a London build, and the one worth budgeting for before you start. The estimator prices the substructure explicitly, and our extensions page explains where it sits in the programme.


The number is decided by the ground, not the drawing

A structural engineer proposes a foundation depth from what can be known in advance: published geology, the position and species of nearby trees, the depth of neighbouring foundations, and whatever trial holes have been dug. That proposal is well-informed and it is still a proposal.

What confirms it is the excavation inspection. Building control attends the open trench, looks at the material the foundation will bear on, and confirms the depth before any concrete is placed. It is one of the notifiable stages, it closes permanently the moment the trench is filled, and it cannot be done retrospectively.

This is the honest part of the process that sounds like the dishonest part. When a builder says “we won’t know until we dig”, they are describing the actual mechanism — not preparing you for a price rise.


The figures

The figureWhat it means on siteSource
0.45mMinimum depth to the underside of a strip foundation, for frost, except where founded on rock. Increase in areas of long frost or to reach satisfactory ground.AD A §2E4
0.75 / 0.9 / 1.0mOn clay with a modified plasticity index of 10% or more: not less than 0.75m (low shrinkage), 0.9m (medium), 1.0m (high). Increase where trees are nearby.AD A §2E4
Projection and thicknessConcrete strip foundations should project each side of the wall by at least the depth of the foundation below the wall face; thickness not less than the projection, and never less than 150mm.AD A §2E2–2E3
70 kN/mCombined dead and imposed load should not exceed this at the base of the wall.AD A §2C24(c)
0.25mWhere the water table can rise to within 0.25m of the lowest floor, drain the ground by gravity or safeguard the building by other effective means.AD C §3.2
InspectionExcavation for foundations is inspected before it is covered — this is the inspection that fixes foundation depth.Building control notifiable stages
NoticeAt least two clear working days' notice to the building control body before work starts.Building control notifiable stages
Excavation safetyExcavations must be supported so they cannot collapse.CDM 2015 reg. 22
Party wallExcavating within 3m of an adjoining structure and deeper than its foundations, or within 6m cutting a 45° line beneath them: 1 month's notice.Party Wall etc. Act 1996, s.6

Approved Documents are statutory guidance to the Building Regulations 2010 for England. Compliance is judged against the Requirements in Schedule 1; your building control body has the final word on your specific building.


Why London makes this worse

Most of London sits on clay, and clay changes volume with moisture. It shrinks as it dries and swells as it rewets, and a foundation sitting inside that zone moves with it. That is the mechanism behind most domestic subsidence in the capital, and it is why the frost minimum of 0.45m is almost never the governing figure here.

Trees make it substantially worse. A mature tree draws moisture out of clay across a radius that depends on its species, its mature height and its distance from the building. Foundations within that influence have to reach below the zone where seasonal movement happens, which on high-shrinkage clay near a large tree can mean well past 1.0m.

Two things surprise people about trees. First, the tree does not have to be in your garden — a neighbour’s, or a street tree, counts. Second, removing the tree can be worse than keeping it. Clay that has been dried by roots for decades will swell as moisture returns, and that heave lifts foundations rather than settling them. On a site where a tree is coming out, that is a conversation with the engineer before it is a conversation with a tree surgeon.


Turn the unknown into a number: trial holes

The single most useful thing you can do before anyone prices your extension is dig trial holes.

A trial hole is a small excavation, usually next to the existing foundation, that shows three things: how deep the existing foundation goes, what the ground is made of, and where the water table sits. It takes a morning. It costs a fraction of one week’s delay.

With trial holes, the engineer designs to measured ground and every contractor prices the same substructure. Without them, each builder is guessing, and the cheapest guess wins the job — which means the cheapest guess is the one that has to be corrected on site, at your expense, in week three.

If you take one thing from this: trial holes before quotes, not after.


How to make a depth change boring

A variation for foundation depth is legitimate. What makes it feel like a scam is when it arrives with no evidence and no agreed rate. Fix that in advance.

Hold a ring-fenced foundation contingency. Not general contingency — a specific allowance for this specific risk, which you either spend on depth or get back. Naming it stops it being absorbed elsewhere.

Hold programme float too. Extra depth is extra days as well as extra money, and a programme with no slack turns a routine variation into a late-delivery argument.

Agree the rate before work starts. A price per additional metre depth, agreed at contract, means a depth change is arithmetic rather than negotiation.

Require photographic evidence. The open trench, dated, with a measure in shot, plus the inspector’s confirmation of the bearing. Any builder doing this properly is already taking those photographs — building control inspections are exactly the moments where a record is worth having.

Ask what the quote assumed. “We’ve allowed 1.0m” is a scope. “Foundations included” is not. Two quotes assuming different depths are not comparable, which is the whole subject of our lesson on what is inside a price.


When depth becomes underpinning

If the dig goes below the underside of an existing foundation — the house’s own, or a neighbour’s — you are no longer just digging deeper. You are removing support from something already standing, and that is underpinning: a different method, a different sequence and a different number.

The threshold matters because it is where a modest depth variation stops being modest. It is worth asking the engineer explicitly, at design stage, how close the proposed dig comes to that line.


The takeaway

The drawing proposes a depth; the ground decides it and building control confirms it. Hold a ring-fenced foundation contingency and programme float, require photographic evidence for any change, and dig trial holes before anyone prices the job. Do that, and a depth variation stops being a shock. It is just the build.


Get an Itemised Estimate

Get your estimate →

Or call us on 020 8050 8968. We work across Fulham, Chelsea, Battersea, Kensington, Hammersmith and the surrounding boroughs.

Common questions

Straight answers

The 2VP Certainty Package

The home you actually want, finished on the date in the contract — and you watch every day of it happen from your phone.

Your number in 60 secondsItemised stage breakdown in 2 minutesSurvey within 7 days

You answer 3 questions. We do the drawings, planning, party wall, trades and snagging.

Before anything is signed
Full measured survey + 3D design visualisation
You see the finished room before you commit to building it
£1,500
RIBA architect design by Nick Elias
Concept, planning and technical drawings by one named architect
£8,000–£15,000
Completion date written into the contract
A date you can plan a life around, not 'TBC at build start'
Included
While we build
No variation without your written approval
Nothing is added to your bill that you did not sign for first
Included
Friday video walkthrough of your site, every week
You know what happened this week without driving over
£1,200/yr
One named project lead, one channel, 24-hour response
You never chase a company — you message a person
Included
Daily photo diary + client dashboard
Everything photographed before it is covered up
Included
Fixtures at our trade pricing, passed through at cost
Our discount is yours, not a margin we keep quiet about
10–20% on materials
After we hand over
6-month snagging visit
We come back once the house has moved and settled
£750
12-month workmanship warranty on second-fix fittings, signed by the trades
The people who built it are on the hook for it, by name
Included
Annual check-ins for 2 years
We come back. Every year. No charge.
Included
Our guarantee
We finish on the agreed date, or we pay you £500 for every week we are late.
The date is in the contract, and so is this. Only a variation you approve can move it.
What you are not risking
  • 10% to mobilise, then weekly against work already done — with 5% held past handover: 2.5% released at practical completion and 2.5% at the end of the 12-month defects period
  • £550 survey fee credited in full against your contract
  • Every variation priced and signed before a penny is spent
4.8★ from 16 Google reviews — including the 1-star, published in full.
Get my price in 60 seconds

No email needed to see your range. Quotes hold for 21 days, then materials re-price.

We are not the cheapest. If price is the only factor, we may not be the right fit — and that is fine.

Get my price in 60 secondsExtensionsExtension costs by areaBuilders in your areaAll cost guides
If this is your project

The home you actually want, finished on the date in the contract — and you watch every day of it happen from your phone.

How fast
  • Your number in 60 seconds
  • Itemised stage breakdown in 2 minutes
  • Survey within 7 days
What you do

You answer 3 questions. We do the drawings, planning, party wall, trades and snagging.

What protects you
  • 10% to mobilise, then weekly against work already done — with 5% held past handover: 2.5% released at practical completion and 2.5% at the end of the 12-month defects period
  • £550 survey fee credited in full against your contract
  • Every variation priced and signed before a penny is spent

The date is a term of the contract. We finish on the agreed date, or we pay you £500 for every week we are late.

Do not take our word for it

4.8 from 16 Google reviews

Every review is published in full on our reviews page, including the one-star. Google is the only platform we quote a rating for, because it is the only one we can evidence.

★★★★★
As a structural engineer, I've collaborated with 2VP Projects Ltd on several residential projects in London. Their attention to detail, proactive site management, and clear communication make every stage—from design to execution—smooth and efficient. It's rare to find a contractor who values both precision and professionalism at this level. A truly reliable partner.
Igors Smirnovs · Structural engineer we have worked with · June 2025
★★★★★
Great company to work with. Professional, reliable and easy to deal with. Vladimir and the team are always responsive, straightforward and genuinely care about doing things properly. I've had a very positive experience working with 2VP and would happily recommend them.
Sheen Delicatessen · Business client · August 2026
★★★★★
Extension went smoothly from start to finish. Communication was great throughout, and the team delivered exactly what we asked for. Thank you, 2VP!
Dan Martea · August 2026
Warranties and protections

What is covered, and by whom

A builder’s own guarantee is worth exactly as much as the company standing behind it. Here is what comes as standard, what you can add, and what has to come from somebody other than us — set out in full on our insurance and guarantee page.

Included in the contract
  • 12-month workmanship warranty on second-fix fittings
  • £5M public liability
  • £10M employer's liability
  • £2M professional indemnity
Optional, on request
  • HomePro insurance-backed guarantee, 10 years
  • Priced at 2.5% of the contract sum
  • Underwritten by an insurer, so it survives us
Not from us
  • 10-year structural warranty on a new dwelling (NHBC / LABC / Premier)
  • Professional fees — architect, engineer, building control
  • We will tell you when you need one rather than let you find out