Kitchen extension costs in London for 2026: side-return £90k–£160k, rear £110k–£210k, wraparound £170k–£320k. The kitchen included, not a separate line.

By Vladimir Castravet·
Open-plan kitchen extension by 2VP in London — rooflights over a dark island and chevron oak flooring

A side-return kitchen-diner in London costs £90,000–£160,000 in 2026, a full-width rear kitchen extension £110,000–£210,000, and a wraparound £170,000–£320,000 — with the kitchen itself inside the figure rather than bolted on afterwards. Our extensions page sets out what a build covers, the cost hub breaks it down by area, and the estimator prices your own footprint.

The kitchen extension is the single most common project we build in London — and the one where clients most often ask the wrong question first. They ask "how much is the extension?" when the number that matters is "how much is the extension, with the kitchen finished and working, ready to cook in?"

This guide sets out real 2026 costs from 2VP’s completed kitchen extensions across Fulham, Peckham, Belgravia and New Cross — extension and kitchen as one number, because that’s how the bill actually arrives.


Kitchen Extension Costs at a Glance (London 2026)

Extension TypeTypical London CostNotes
Side-return kitchen-diner£90,000 – £160,000Captures the dead alley beside the kitchen; usually PD-compliant
Rear kitchen extension£110,000 – £210,000Full-width rear pop-out; the standard kitchen-diner upgrade
Wraparound (side + rear)£170,000 – £320,000Side-return + rear combined; usually needs full planning
Basement kitchen extension£250,000 – £750,000Highest cost and disruption, largest usable gain on a tight plot

Prices include design, structural engineering, building regulations, the kitchen fit-out, labour, materials and VAT.


Why We Price the Kitchen and the Extension as One Number

Most quotes homeowners collect price the building shell — steels, roof, glazing, floor slab — and leave the kitchen as "allow £X, to be confirmed." That gap is where budgets go wrong: by the time the shell is finished, there’s pressure to spend what’s left rather than what the room needs.

2VP’s extension pricing always includes the kitchen itself — cabinetry, worktop and integrated appliances — built by our own joinery partner, Selection.Works, inside the same contract. One number, one programme, no handoff between a builder and a separate kitchen supplier.


What Drives the Cost?

1. Extension type

A side-return is the cheapest way to a proper kitchen-diner because it uses an existing party wall on one side. A rear extension needs new walls on three sides. A wraparound is both combined. A basement is a different order of project — excavation, underpinning and waterproofing before a single kitchen unit goes in.

2. Glazing

Bifold doors or a full-width rear glazing wall are usually the single biggest line item after the kitchen itself. Off-the-shelf aluminium bifolds run roughly £900–£1,400 per linear metre supplied and fitted; a bespoke crittall-style steel screen from AtoZ Design & Glass costs more but holds slimmer sightlines.

3. Kitchen tier

The difference between a semi-bespoke and a fully bespoke kitchen on the same footprint can be £15,000–£30,000 — stone versus engineered worktop, integrated versus freestanding appliances, and the amount of bespoke joinery (larder units, breakfast bar, built-in seating).

4. Postcode

A rear kitchen extension in Chelsea (SW3) or Notting Hill (W11) costs 30–40% more than the same specification in outer boroughs, driven by labour rates and the higher finish expectation those postcodes carry.

5. The two limits that catch a side-return

The depth limits are the ones everyone quotes: under Class A of the GPDO a single-storey rear extension is permitted development up to 4 metres beyond the original rear wall on a detached house, or 3 metres on any other house (A.1(f)(i)), stretching to 8 and 6 metres with a prior approval application (A.1(g)(i)) — and capped at 4 metres in height either way.

Two less-quoted sub-paragraphs are what actually bite on a side-return, because it is built along a boundary by definition. A.1(i): if any part of the extension comes within 2 metres of the boundary, the eaves may not exceed 3 metres. A.1(j): anything extending beyond a side elevation may not exceed 4 metres in height, and may not have more than a single storey. So a side-return with a raised eaves line, or a pitched roof carried too high, loses permitted development on a technicality that has nothing to do with how far back it goes. Check the designation and the eaves height before a drawing is commissioned.

6. Planning and party wall

Side-returns and wraparounds usually need full planning permission, adding £3,000–£8,000 in fees and 8–12 weeks to the programme. Any extension built up to or near a shared boundary triggers the Party Wall etc. Act 1996 — see our party wall cost guide for what that adds.


Which Type Is Right for You?

Choose a side-return if: your kitchen already backs onto a side alley, you want the lowest-disruption route to a kitchen-diner, and Permitted Development applies outside a conservation area.

Choose a rear extension if: you want the widest possible run of glazing onto the garden and your side return isn’t usable or doesn’t exist.

Choose a wraparound if: you want a genuinely large open-plan kitchen-diner-family room, and you’re prepared for full planning permission.

Choose a basement if: your footprint is fixed by the building line and a rear or side extension isn’t possible or wouldn’t give you enough space.

For the full breakdown of extension types beyond the kitchen — including double-storey and non-kitchen configurations — see our London extension cost guide and side-return extension guide.


Get Your Estimate

Use our instant cost calculator to get a personalised estimate for your kitchen extension — no sales calls, no commitment, detailed range in under 2 minutes.

Get your kitchen extension estimate →

Prefer to see it built first? Our projects carry the photographs, and the cost hub breaks the figures down borough by borough. We offer same-day site visits across our core areas — SW6, SW3, SW11, W11, W4, W6 and W2.

Common questions

Straight answers

The 2VP Certainty Package

The home you actually want, finished on the date in the contract — and you watch every day of it happen from your phone.

Your number in 60 secondsItemised stage breakdown in 2 minutesSurvey within 7 days

You answer 3 questions. We do the drawings, planning, party wall, trades and snagging.

Before anything is signed
Full measured survey + 3D design visualisation
You see the finished room before you commit to building it
£1,500
RIBA architect design by Nick Elias
Concept, planning and technical drawings by one named architect
£8,000–£15,000
Completion date written into the contract
A date you can plan a life around, not 'TBC at build start'
Included
While we build
No variation without your written approval
Nothing is added to your bill that you did not sign for first
Included
Friday video walkthrough of your site, every week
You know what happened this week without driving over
£1,200/yr
One named project lead, one channel, 24-hour response
You never chase a company — you message a person
Included
Daily photo diary + client dashboard
Everything photographed before it is covered up
Included
Fixtures at our trade pricing, passed through at cost
Our discount is yours, not a margin we keep quiet about
10–20% on materials
After we hand over
6-month snagging visit
We come back once the house has moved and settled
£750
12-month workmanship warranty on second-fix fittings, signed by the trades
The people who built it are on the hook for it, by name
Included
Annual check-ins for 2 years
We come back. Every year. No charge.
Included
Our guarantee
We finish on the agreed date, or we pay you £500 for every week we are late.
The date is in the contract, and so is this. Only a variation you approve can move it.
What you are not risking
  • 10% to mobilise, then weekly against work already done — with 5% held past handover: 2.5% released at practical completion and 2.5% at the end of the 12-month defects period
  • £550 survey fee credited in full against your contract
  • Every variation priced and signed before a penny is spent
4.8★ from 16 Google reviews — including the 1-star, published in full.
Get my price in 60 seconds

No email needed to see your range. Quotes hold for 21 days, then materials re-price.

We are not the cheapest. If price is the only factor, we may not be the right fit — and that is fine.

Get my price in 60 secondsExtensionsExtension costs by areaBuilders in your areaAll cost guides
If this is your project

The home you actually want, finished on the date in the contract — and you watch every day of it happen from your phone.

How fast
  • Your number in 60 seconds
  • Itemised stage breakdown in 2 minutes
  • Survey within 7 days
What you do

You answer 3 questions. We do the drawings, planning, party wall, trades and snagging.

What protects you
  • 10% to mobilise, then weekly against work already done — with 5% held past handover: 2.5% released at practical completion and 2.5% at the end of the 12-month defects period
  • £550 survey fee credited in full against your contract
  • Every variation priced and signed before a penny is spent

The date is a term of the contract. We finish on the agreed date, or we pay you £500 for every week we are late.

Do not take our word for it

4.8 from 16 Google reviews

Every review is published in full on our reviews page, including the one-star. Google is the only platform we quote a rating for, because it is the only one we can evidence.

★★★★★
As a structural engineer, I've collaborated with 2VP Projects Ltd on several residential projects in London. Their attention to detail, proactive site management, and clear communication make every stage—from design to execution—smooth and efficient. It's rare to find a contractor who values both precision and professionalism at this level. A truly reliable partner.
Igors Smirnovs · Structural engineer we have worked with · June 2025
★★★★★
Great company to work with. Professional, reliable and easy to deal with. Vladimir and the team are always responsive, straightforward and genuinely care about doing things properly. I've had a very positive experience working with 2VP and would happily recommend them.
Sheen Delicatessen · Business client · August 2026
★★★★★
Extension went smoothly from start to finish. Communication was great throughout, and the team delivered exactly what we asked for. Thank you, 2VP!
Dan Martea · August 2026
Warranties and protections

What is covered, and by whom

A builder’s own guarantee is worth exactly as much as the company standing behind it. Here is what comes as standard, what you can add, and what has to come from somebody other than us — set out in full on our insurance and guarantee page.

Included in the contract
  • 12-month workmanship warranty on second-fix fittings
  • £5M public liability
  • £10M employer's liability
  • £2M professional indemnity
Optional, on request
  • HomePro insurance-backed guarantee, 10 years
  • Priced at 2.5% of the contract sum
  • Underwritten by an insurer, so it survives us
Not from us
  • 10-year structural warranty on a new dwelling (NHBC / LABC / Premier)
  • Professional fees — architect, engineer, building control
  • We will tell you when you need one rather than let you find out