Fire-Stopping: Ask for the Photographs Before the Walls Close

Expanding foam is not fire-stopping. Every service penetration needs a tested seal, and Regulation 38 entitles you to the record. Ask before the boards go on.

By Vladimir Castravet·

Here is a simple way to test a builder: ask for photographs of every wire and pipe before the walls are boarded. Once plasterboard goes on, nobody looks behind it again — which is exactly where corners get cut. And you are entitled to the record anyway: Regulation 38 makes handing over fire safety information a legal duty. Our renovation work and loft conversions both live or die on this detail, and the estimator prices it as part of the build rather than as an extra.


What fire-stopping is

A fire-separating element — the wall around a protected stair, a compartment floor, the wall between a house and an integral garage — is built to hold fire back for a stated period. In a house that baseline is REI 30: thirty minutes of load-bearing capacity, integrity and insulation, with fire doorsets at E 30.

That rating belongs to the element as built. The moment somebody drills through it for a soil pipe, a cable, a duct or a joist hanger and leaves a gap, the rating is gone at that point — and fire and smoke travel through gaps faster than through anything else in a building.

Fire-stopping is the sealing of every one of those joints, imperfect fits and service openings so the element keeps the resistance it was designed to have. It is one of the last things done before boards go on, and one of the first things to disappear.


The figures

The ruleWhat it requiresSource
The general ruleEvery joint, imperfect fit and opening for services through a fire-separating element should be sealed with fire-stopping so the fire resistance of the element is not impaired.AD B Vol 1 §9.1
Baseline in a houseREI 30 is the baseline for fire-separating construction in dwellinghouses; fire doorsets E 30 (FD30).AD B Vol 1, Table B4
Pipes through a fire wallThree permitted routes: a proprietary tested sealing system (any diameter), a restricted diameter per Table 9.1, or sleeving.AD B Vol 1 §9.2–9.5
Pipe diameter limitsBetween dwellings: 160mm high-melting-point metal; 160mm stack / 110mm branch for uPVC, lead, aluminium or fibre-cement in an enclosure; 40mm any other material.AD B Vol 1 Table 9.1
SleevingMaximum nominal internal diameter 160mm, sleeved in metal that will not soften or fracture at 800°C.AD B Vol 1 §9.5
What is not fire-stoppingMaterials must be reinforced with or supported by materials of the appropriate class. Expanding foam alone is not fire-stopping.AD B Vol 1 §9.25–9.27
Cavity barriersProvided at the edges of cavities, around openings, and to subdivide extensive cavities. Not the same as fire-stopping.AD B Vol 1 §8.1–8.6
At roof levelFire-stopping carried over the full thickness of the wall and up to the underside of the roof covering, boarding or slab, and extended into any eaves.AD B Vol 1 §7.4
Smoke alarmsAt least one on every storey. Grade D1, mains with battery back-up, interlinked. Sited on the ceiling at least 300mm from any wall or light fitting.AD B Vol 1 §1.2–1.14
The 4.5m ruleEscape provisions step up at each storey more than 4.5m above ground level — which is why a loft conversion on a two-storey house triggers a protected stair.AD B Vol 1 §2.1–2.6
HandoverFire safety information must be given to the building owner on completion. A legal duty, not a courtesy.Building Regulations 2010, reg. 38

Approved Documents are statutory guidance to the Building Regulations 2010 for England. Compliance is judged against the Requirements in Schedule 1; your building control body has the final word on your specific building.


Where it goes wrong

Expanding foam. It is fast, it looks tidy, it fills the hole, and it is not fire-stopping. This is the single most common thing found behind plasterboard on domestic work.

The pipe nobody collared. A plastic soil stack passing through a compartment floor melts early in a fire and leaves an open shaft between storeys. That is what an intumescent collar is for — it expands under heat and crushes the pipe closed.

Downlighters. A protected ceiling perforated by a dozen unrated downlights is a protected ceiling with a dozen holes in it. Fire-rated fittings or hoods exist precisely for this.

The loft hatch and the top of the stair enclosure. Fire-stopping has to be carried over the full thickness of the wall and up to the underside of the roof covering, and extended into the eaves. Stopping at ceiling level leaves the route that matters most open.

Cavity barriers confused with fire-stopping. They are different jobs. Fire-stopping seals a penetration through an element; a cavity barrier subdivides a concealed void so fire cannot travel unseen behind the finishes. You can have one perfectly and lack the other entirely.


Why this is the best test of a builder there is

Almost everything else you buy on a renovation, you can inspect. You can see whether the tiling is straight, whether the paint is even, whether the kitchen doors line up. If you do not like it, you say so.

Fire-stopping you will never see. It goes in on a Tuesday and vanishes on a Wednesday. Nobody will look at it again unless there is a fire or you sell the house and a surveyor gets curious. It costs relatively little to do properly, it takes patience rather than skill, and there is no commercial consequence to skipping it — which is precisely why it is the honest test.

So ask. Not aggressively, and not as an accusation: “Can you photograph the penetrations before you board? I’d like them for the file.”

A good builder will already have them. Ours photograph every covered element as a matter of course — foundations at bearing level, steel bearings and padstones, cavity trays and weep holes, fire-stopping at every penetration, insulation, drainage before backfill — dated and indexed, because on a job where everything is photographed there is nothing to argue about later.

A builder who finds the question strange has told you something worth knowing, at no cost, at the exact moment you can still act on it.


The inspection that matters

The first fix / pre-plaster inspection is where structure, fire-stopping, cavity barriers, insulation and services are looked at together, before they disappear behind plasterboard. It is one of the notifiable stages, and like every other one it closes permanently the moment the work is covered. The only remedy for a missed inspection is opening the work back up.

That single fact is why the photographs matter more here than anywhere else on the job. An inspector attends once. A photograph lasts.

At completion, Regulation 38 requires the fire safety information to be handed to you, alongside the completion certificate, the Regulation 40 building information and the competent-person certificates. Ask for all of it in one file. In year three, when a question comes up, the answer is either in that file or it does not exist.

The same logic applies to the details that keep water out — the damp-proof course and the weep holes are equally invisible and equally permanent.


The takeaway

Fire-stopping is the clearest test of a builder there is, because it is work you will never see. Ask for the photographs before the boards go on. A good builder is proud of the parts you cannot see — and Regulation 38 means you are entitled to the record anyway.


Get an Itemised Estimate

Get your estimate →

Or call us on 020 8050 8968. We work across Fulham, Chelsea, Battersea, Kensington, Hammersmith and the surrounding boroughs.

Common questions

Straight answers

The 2VP Certainty Package

The home you actually want, finished on the date in the contract — and you watch every day of it happen from your phone.

Your number in 60 secondsItemised stage breakdown in 2 minutesSurvey within 7 days

You answer 3 questions. We do the drawings, planning, party wall, trades and snagging.

Before anything is signed
Full measured survey + 3D design visualisation
You see the finished room before you commit to building it
£1,500
RIBA architect design by Nick Elias
Concept, planning and technical drawings by one named architect
£8,000–£15,000
Completion date written into the contract
A date you can plan a life around, not 'TBC at build start'
Included
While we build
No variation without your written approval
Nothing is added to your bill that you did not sign for first
Included
Friday video walkthrough of your site, every week
You know what happened this week without driving over
£1,200/yr
One named project lead, one channel, 24-hour response
You never chase a company — you message a person
Included
Daily photo diary + client dashboard
Everything photographed before it is covered up
Included
Fixtures at our trade pricing, passed through at cost
Our discount is yours, not a margin we keep quiet about
10–20% on materials
After we hand over
6-month snagging visit
We come back once the house has moved and settled
£750
12-month workmanship warranty on second-fix fittings, signed by the trades
The people who built it are on the hook for it, by name
Included
Annual check-ins for 2 years
We come back. Every year. No charge.
Included
Our guarantee
We finish on the agreed date, or we pay you £500 for every week we are late.
The date is in the contract, and so is this. Only a variation you approve can move it.
What you are not risking
  • 10% to mobilise, then weekly against work already done — with 5% held past handover: 2.5% released at practical completion and 2.5% at the end of the 12-month defects period
  • £550 survey fee credited in full against your contract
  • Every variation priced and signed before a penny is spent
4.8★ from 16 Google reviews — including the 1-star, published in full.
Get my price in 60 seconds

No email needed to see your range. Quotes hold for 21 days, then materials re-price.

We are not the cheapest. If price is the only factor, we may not be the right fit — and that is fine.

Get my price in 60 secondsFull renovationsRenovation costs by areaBuilders in your areaAll cost guides
If this is your project

The home you actually want, finished on the date in the contract — and you watch every day of it happen from your phone.

How fast
  • Your number in 60 seconds
  • Itemised stage breakdown in 2 minutes
  • Survey within 7 days
What you do

You answer 3 questions. We do the drawings, planning, party wall, trades and snagging.

What protects you
  • 10% to mobilise, then weekly against work already done — with 5% held past handover: 2.5% released at practical completion and 2.5% at the end of the 12-month defects period
  • £550 survey fee credited in full against your contract
  • Every variation priced and signed before a penny is spent

The date is a term of the contract. We finish on the agreed date, or we pay you £500 for every week we are late.

Do not take our word for it

4.8 from 16 Google reviews

Every review is published in full on our reviews page, including the one-star. Google is the only platform we quote a rating for, because it is the only one we can evidence.

★★★★★
As a structural engineer, I've collaborated with 2VP Projects Ltd on several residential projects in London. Their attention to detail, proactive site management, and clear communication make every stage—from design to execution—smooth and efficient. It's rare to find a contractor who values both precision and professionalism at this level. A truly reliable partner.
Igors Smirnovs · Structural engineer we have worked with · June 2025
★★★★★
Great company to work with. Professional, reliable and easy to deal with. Vladimir and the team are always responsive, straightforward and genuinely care about doing things properly. I've had a very positive experience working with 2VP and would happily recommend them.
Sheen Delicatessen · Business client · August 2026
★★★★★
Extension went smoothly from start to finish. Communication was great throughout, and the team delivered exactly what we asked for. Thank you, 2VP!
Dan Martea · August 2026
Warranties and protections

What is covered, and by whom

A builder’s own guarantee is worth exactly as much as the company standing behind it. Here is what comes as standard, what you can add, and what has to come from somebody other than us — set out in full on our insurance and guarantee page.

Included in the contract
  • 12-month workmanship warranty on second-fix fittings
  • £5M public liability
  • £10M employer's liability
  • £2M professional indemnity
Optional, on request
  • HomePro insurance-backed guarantee, 10 years
  • Priced at 2.5% of the contract sum
  • Underwritten by an insurer, so it survives us
Not from us
  • 10-year structural warranty on a new dwelling (NHBC / LABC / Premier)
  • Professional fees — architect, engineer, building control
  • We will tell you when you need one rather than let you find out