Check Your Water Pressure Before You Renovate — Not After the Tiling

Pressure and flow are different numbers and only one of them fills a bath. Measure both at the highest, furthest outlet before the design is fixed.

By Vladimir Castravet·

There is one test that costs almost nothing before you start and a fortune after. Measure the pressure and the flow at the tap — they are different numbers, and only one of them fills a bath. A mixer shower generally needs about 12 litres per minute to feel right, and your supply is held to a minimum of 0.7 bar at the communication pipe. Then design the bathrooms and the heating to those measured numbers rather than to a guess. The estimator prices the plumbing scope, and our renovation work covers the stage where this decision has to be made.

Water PressureFilm page · Watch on YouTube

Two numbers, not one

Pressure is the force behind the water, measured in bar. Flow is how much water actually arrives, measured in litres per minute.

People say “the pressure is bad” when what they almost always mean is that the flow is bad. A house can have perfectly respectable pressure at the stop tap and still deliver a disappointing shower, because the pipework between the two is narrow, furred, kinked, or has been reduced somewhere along its length by a previous owner’s helpful plumber.

Flow is what fills a bath. Flow is what a rainfall head needs. Flow is what runs out when two people shower at once. It is the number that matters most and the one nobody measures.


The test, which takes fifteen minutes

Flow. Take a container of known volume — a bucket you have measured, or a two-litre jug. Open the cold tap fully. Time how long it takes to fill. Convert to litres per minute.

Pressure. A screw-on gauge costs very little and fits an outside tap or a washing machine connection. Read it with everything off (static) and with a tap running (dynamic). The gap between those two numbers tells you as much as either alone — a large drop means restriction in the pipework.

Three rules about where and when:

  1. Test at the highest and furthest outlet you plan to build, not at the kitchen sink. If the new shower is going in the loft, the ground floor tap is not the answer.
  2. Test at a busy time. Weekday evening, not midnight. Mains pressure in a London street varies with demand.
  3. Test more than once. One reading is an anecdote.

Write the numbers down. They belong in the brief, alongside the room sizes.


The figures

The figureWhat it meansSource
7m static head (≈0.7 bar)The minimum standard water undertakers are held to at the communication pipe.Water Industry Act 1991, s.65
10m head at 9 l/minOfwat's low-pressure reference level, measured at the boundary stop tap.Ofwat
48°CHot water to a bath must be limited to a maximum of 48°C by an in-line blending valve or other temperature control with a maximum temperature stop.AD G §3.65–3.66
100°CPrecautions must prevent the temperature of stored water at any time exceeding 100°C.Requirement G3(3)
60°C / 55°CTo control legionella, stored hot water generally at 60°C and distributed at not less than 55°C.AD G §3 / HSG274
Unvented cylindersMust have the required safety devices and a correctly terminated discharge pipe; installation is work for a competent person.AD G §3.22–3.23
125 l/person/dayWater efficiency cap for a new dwelling — 110 where planning imposes the optional requirement.reg. 36 / AD G2
Commissioning noticeNot more than 5 days after commissioning where a building notice, full plans or initial notice applies; otherwise not more than 30 days.AD G §3.78
Plumbing complianceAll plumbing must comply — backflow prevention, approved fittings, notification of certain installations to the water undertaker.Water Supply (Water Fittings) Regulations 1999

Approved Documents are statutory guidance to the Building Regulations 2010 for England. Compliance is judged against the Requirements in Schedule 1; your building control body has the final word on your specific building.


The combi boiler trap

This is the single most common way a well-designed renovation disappoints.

A combi boiler makes hot water on demand, and its hot water output is limited by its own flow rate. Whatever that figure is, it is shared. Add a second bathroom and run both showers together and each one gets roughly half.

So the sequence that causes the problem is completely reasonable at every step: the family adds an ensuite, the plumber connects it to the existing boiler because the boiler is fine, and the first time two people shower simultaneously everybody is disappointed. Nothing was installed badly. The system was never sized for the house that now exists.

The same applies to a large rainfall head. Rainfall heads are specified by how they look and consume water by how big they are. A head that wants twenty-odd litres a minute on a supply delivering twelve will produce a gentle drizzle, beautifully.

Ask the question at design stage: what is the flow, what does the specified sanitaryware need, and what happens when two outlets run at once?


What to do if the number is too low

Re-pipe the restriction. Often the mains supply is fine and the incoming pipe inside the property is old, narrow or partially blocked. Upgrading the internal run is frequently the cheapest real fix.

Fit an accumulator. A vessel that stores mains-pressure water and releases it at the flow you need during peak demand. It does not add pressure beyond the mains, but it removes the flow bottleneck. It needs space.

Move to an unvented cylinder. Stored hot water at mains pressure, which handles multiple outlets far better than a combi. It needs space, safety devices and a correctly terminated discharge pipe, and it is work for a competent person.

Break tank and pump. Where the mains genuinely cannot deliver. You are generally not permitted to pump directly off the incoming supply, because that draws down pressure for your neighbours — so the compliant route is a tank, then a pump.

Or change the specification. A smaller shower head that is well-chosen can feel better than a large one that is starved. This is the cheapest answer of all and it is worth considering honestly before spending on plant.

Every one of these takes space, and space is decided at design stage. That is the entire point of testing early: the decision is cheap before the layout is fixed and expensive afterwards.


While you are testing, check two more things

The bath blending valve. Hot water to a bath must be limited to a maximum of 48°C by a blending valve or equivalent control with a maximum temperature stop. It is a small item that is genuinely a safety requirement, and it is regularly missing from older installations.

The stored water temperature strategy. Legionella control wants stored hot water generally at 60°C and distributed at not less than 55°C — which is why the 48°C limit at the bath is achieved by blending at the outlet rather than by simply storing water cooler.


The takeaway

Test the pressure and the flow before the design is fixed, at the highest and furthest outlet you plan to build. Then design the bathrooms and the heating to the measured number. Take the decision before — not after the tiling.

It is the same principle that governs testing a floor before choosing a finish: measure the thing you are building on, while measuring is still free.


Get an Itemised Estimate

Get your estimate →

Or call us on 020 8050 8968. We work across Fulham, Chelsea, Battersea, Kensington, Hammersmith and the surrounding boroughs.

Common questions

Straight answers

The 2VP Certainty Package

The home you actually want, finished on the date in the contract — and you watch every day of it happen from your phone.

Your number in 60 secondsItemised stage breakdown in 2 minutesSurvey within 7 days

You answer 3 questions. We do the drawings, planning, party wall, trades and snagging.

Before anything is signed
Full measured survey + 3D design visualisation
You see the finished room before you commit to building it
£1,500
RIBA architect design by Nick Elias
Concept, planning and technical drawings by one named architect
£8,000–£15,000
Completion date written into the contract
A date you can plan a life around, not 'TBC at build start'
Included
While we build
No variation without your written approval
Nothing is added to your bill that you did not sign for first
Included
Friday video walkthrough of your site, every week
You know what happened this week without driving over
£1,200/yr
One named project lead, one channel, 24-hour response
You never chase a company — you message a person
Included
Daily photo diary + client dashboard
Everything photographed before it is covered up
Included
Fixtures at our trade pricing, passed through at cost
Our discount is yours, not a margin we keep quiet about
10–20% on materials
After we hand over
6-month snagging visit
We come back once the house has moved and settled
£750
12-month workmanship warranty on second-fix fittings, signed by the trades
The people who built it are on the hook for it, by name
Included
Annual check-ins for 2 years
We come back. Every year. No charge.
Included
Our guarantee
We finish on the agreed date, or we pay you £500 for every week we are late.
The date is in the contract, and so is this. Only a variation you approve can move it.
What you are not risking
  • 10% to mobilise, then weekly against work already done — with 5% held past handover: 2.5% released at practical completion and 2.5% at the end of the 12-month defects period
  • £550 survey fee credited in full against your contract
  • Every variation priced and signed before a penny is spent
4.8★ from 16 Google reviews — including the 1-star, published in full.
Get my price in 60 seconds

No email needed to see your range. Quotes hold for 21 days, then materials re-price.

We are not the cheapest. If price is the only factor, we may not be the right fit — and that is fine.

Get my price in 60 secondsFull renovationsRenovation costs by areaBuilders in your areaAll cost guides
If this is your project

The home you actually want, finished on the date in the contract — and you watch every day of it happen from your phone.

How fast
  • Your number in 60 seconds
  • Itemised stage breakdown in 2 minutes
  • Survey within 7 days
What you do

You answer 3 questions. We do the drawings, planning, party wall, trades and snagging.

What protects you
  • 10% to mobilise, then weekly against work already done — with 5% held past handover: 2.5% released at practical completion and 2.5% at the end of the 12-month defects period
  • £550 survey fee credited in full against your contract
  • Every variation priced and signed before a penny is spent

The date is a term of the contract. We finish on the agreed date, or we pay you £500 for every week we are late.

Do not take our word for it

4.8 from 16 Google reviews

Every review is published in full on our reviews page, including the one-star. Google is the only platform we quote a rating for, because it is the only one we can evidence.

★★★★★
As a structural engineer, I've collaborated with 2VP Projects Ltd on several residential projects in London. Their attention to detail, proactive site management, and clear communication make every stage—from design to execution—smooth and efficient. It's rare to find a contractor who values both precision and professionalism at this level. A truly reliable partner.
Igors Smirnovs · Structural engineer we have worked with · June 2025
★★★★★
Great company to work with. Professional, reliable and easy to deal with. Vladimir and the team are always responsive, straightforward and genuinely care about doing things properly. I've had a very positive experience working with 2VP and would happily recommend them.
Sheen Delicatessen · Business client · August 2026
★★★★★
Extension went smoothly from start to finish. Communication was great throughout, and the team delivered exactly what we asked for. Thank you, 2VP!
Dan Martea · August 2026
Warranties and protections

What is covered, and by whom

A builder’s own guarantee is worth exactly as much as the company standing behind it. Here is what comes as standard, what you can add, and what has to come from somebody other than us — set out in full on our insurance and guarantee page.

Included in the contract
  • 12-month workmanship warranty on second-fix fittings
  • £5M public liability
  • £10M employer's liability
  • £2M professional indemnity
Optional, on request
  • HomePro insurance-backed guarantee, 10 years
  • Priced at 2.5% of the contract sum
  • Underwritten by an insurer, so it survives us
Not from us
  • 10-year structural warranty on a new dwelling (NHBC / LABC / Premier)
  • Professional fees — architect, engineer, building control
  • We will tell you when you need one rather than let you find out